01-P1150972
to bring more light into the kitchen and to stop the leaking terrace, we followed the architect’ s plan

02-P1160007

03-P1160005

04-P1150988
the ceiling was to undo and the small window to extend

06-P1150986

05-P1150981

07-IMG_0032 copy
to protect the house and to assure the continuity of the work during bad weather periods
08-IMGP4363
we built a light carpentry with a metal roof
10-IMG_0019 copy 3
this was proved to be necessary because a heavy rain during 3 days would have flooded the house
11-IMG_0018 copy
a new concrete beam was installed to carry the new terrace and roof
12-IMG_0006 copy
2 tubular steels were fixed
13-IMG_0009
lifting the new wooden beam for the new roof

 

14-P1160192
placing the rafters

15-P1160158

17-P1170207
after the roof was covered with tiles the temporary roof was undone

 

19-P1170271
working on the metal windows
20-P1170311
insulation on the new terrace
21-P1170266
the insulation of the roof, plasterboards and 3 windows with electrical mechanism were placed

 

22-P1170239

25-P1170235

26-P1170244

[/hcolumns]

 

 

28-IMGP4375
dust proof to protect the other rooms of the house
29-IMG_0094
natural stone flooring in the new kitchen

30-IMG_0095

 

35-IMG_0055
it was a pleasure to execute the plans of the architect
34-IMG_0034
terrace finished
36-IMG_0065
good night
[/hcolumns]

 

 

 

 

 

 

[/hcolumns] [/hcolumns]